Project Profile

EDP Centre of an International Bank in Hong Kong

Name
EDP Centre of an International Bank in Hong Kong
Commencement
01/2002
Completion
01/2003
Location
Central
Client
An International Bank in Hong Kong
Scope of  Work
Maintenance Contract of HVAC System 
Description
<ul> <li> Comprehensive Regular Preventive Maintenance including Checking and Repairing of CRAC System / Equipment.</li> <li> Annual Overhauling and Inspection Service.</li> <li> 24 Hours Call Centre, attend Emergency Callout Service and Repairing.</li> <li> Conditions Survey to the System / Equipment and provide improvement proposal.  </li> </ul>
Main Equipment
Reciprocating Air Cooled Packaged Chiller, Intelligent Precision Air Conditioning Unit, Variable Refrigerant Volume Split Type Air conditioner And Water Detection System
Capacity
400 tonnage